After a leak, the surfaces dry fast while the structure stays wet. Framing, subfloors, and wall cavities hold moisture you cannot see. Structural drying uses measured airflow and dehumidification to bring those materials back to normal moisture levels.
Free referral to independent, licensed and insured local pros. Zip codes served include 83202.

We are a referral line, not a contractor. Calls are routed to independent local pros around Tyhee who treat drying as a measured process with daily readings and written logs.
LGR dehumidifiers, desiccants for tough jobs, and air movers placed with purpose, not just pointed at the wall.
Daily logs track humidity and material readings so drying decisions are based on data.
Each contractor runs an independent, licensed and insured business. Confirm both with the pro before equipment is set.
Drying is usually billed by equipment per day plus monitoring visits. You get the rates and an estimated number of days in writing.

Good drying starts with a moisture map and ends with readings that match dry standard. Everything in between is about controlling air, temperature, and humidity.

Pin and pinless meters plus an infrared camera show exactly where water traveled, including under cabinets, inside walls, and across the subfloor.
Plastic containment creates a smaller drying chamber, so dehumidifiers work on a defined space and drying moves faster.
Injecting dry air through small holes can dry wall cavities without full flood cuts.
Hardwood and subfloors are dried with mats and controlled airflow to reduce cupping.
Equipment stays until wet materials match dry standard readings. The final log becomes part of your insurance file.
Tell the dispatcher when the leak happened and what has been done so far.
A local contractor calls back with an arrival time and brings meters, a thermal camera, and an initial set of drying equipment.
The pro maps moisture, records dry standard from unaffected areas, calculates equipment needs, and gives you a written estimate.
Equipment runs with daily readings and adjustments until every material reaches dry standard, then it is removed and the log is handed over.
Get readings before you rebuild.
A week of box fans did nothing. The pro found wet framing with infrared and dried it properly in four days.
Laura F.Hidden wet framing after leakWall injection drying saved our drywall. Just a few small holes behind the baseboards.
Kevin Y.Wall cavity dryingI liked seeing the daily log. Humidity numbers, wood readings, all of it. The adjuster liked it too.
Mariah S.Insurance drying documentationThey saved our cupping hardwood with floor mats and patient drying.
Henry L.Hardwood floor drying

Typically three to five days, longer for hardwood, plaster, or concrete.
Consumer equipment is too weak to dry framing quickly enough to prevent mold.
Dry standard is the normal moisture reading of the same type of material in an unaffected part of the home. Drying is complete when wet materials match it.
GPP is a measure of moisture in the air. Lower GPP means faster drying.
It is loud and warm. Closing off the drying area helps at night.
No. We connect you with independent local pros. Confirm their license and insurance before work starts.

Independent drying specialists in the network serve Tyhee, ID and nearby zip codes like 83202.
Nearby cities are listed below.
